Project

For an interconnected railway in the DRC

Project Presentation

DRC Ndjandja Project


Download the project presentation and pre feasibility study here

Download here

Project Ndjandja

Due to its large economy of scale and low cost, railway was identified as a plausible solution to the current impasse in DRC. The pre-feasilbility study aims at investigating the possibility of developing a national railway linking all DRC major concentrations zones with a final link to the port of Banana to the far west of the country where a future deep water port is under planning. Various viable options will be assessed and a preferred option will be selected. A phased approach to the project may be considered.

The Democratic Republic of                            Congo

The Democratic Republic of Congo (DRC) is the largest country in sub-Saharan Africa with 2,345,000 square km


read more

         


Railway Development


Like in most sub-Saharan countries, railways in DRC have also played, throughout history, a key part in the economic development of the country       


read more

         


          Pre-Feasibility study



The pre-feasibility study aims at investigating the possibility of developing a national railway networks linking all DRC major          


read more